
Project scope
Excavation of the lagoon site at Rancho Santa Ana, in Huaquechula, Puebla, where the biodigester is located.
Topsoil stripping, layout and cutting with a CAT 320 excavator with a hydraulic hammer. The excavated material is separated: tepetate goes to the industrial building platforms and topsoil to the roads.




