Project scope
Topsoil stripping of Site 2 at Rancho Santa Ana and surveying for the start of works: dual-frequency GPS survey in RTK mode, location of the control traverse points and benchmark, layout of the internal road and setting-out of the buildings, staking the axes of the perimeter columns of each building.